Hong Kong Regulations
- CHAPTER 123B
TABLE OF PROVISIONS
Long Title
1. Citation
2. Interpretation
3. Materials
4. Appropriate limitations not to be exceeded
5. Method of design
6. Overloading
7. Adjoining and other building or land not to be adversely affected
8. Changes in level
9. Site investigation
9A. Building design and construction in connection with lifts and
escalators
10. Cement
11. Sand
12. Water
13. Materials for damp proofing
14. Chunam
15. Resistance to sliding, uplift and overturning
16. Dead loads
17. Imposed loads
18. Wind loads
19. Notice as to load
20. Site formation works
21. Bulk excavation in area number 1 of the scheduled areas
22. Interpretation
23. Foundation works
24. Site investigation
25. Allowable capacity for bearing, bond or friction of ground
26. Pile foundations
27. Cast-in-place concrete foundations
28. Horizontal restraints to piles and pile caps
29. On site tests to be made where doubt exists
30. Proof tests on foundation units
31. Ground treatment
32. Covering of sites
33. Areas to be paved
34. Certain floors to be impermeable
35. Floor next above external ground level
36. Skirting
37. Interpretation
38. External wall of buildings
39. Cladding
40. No timber in walls
41. Protection against penetration of moisture
42. Interpretation
43. Curtain walls
44. Application of regulations
45. Provision of flues
46. Construction of chimneys and fireplaces
47. Corrosion
48. Roofs to be weatherproof
49. Flat roof
50. Cement
51. Aggregate
52. Water
53. Admixtures
54. Reinforcement
55. Pre-stressing tendons
56. General
57. Designed mix concrete strengths
58. Concrete cubes
59. Acceptance criteria
60. Concrete for minor structural and non-structural works
61. Formwork
62. Minimum cover of reinforcement
63. Core testing
64. Interpretation
65. General requirement
66. Filters
67. Backfill material
68. Earth pressure
69. Water pressure
70. Minimum pressure
71. Retaining wall design
72. Loading condition
73. Site investigation
74. Adequate factor of safety
75. Validity of design earth pressure
76. Masonry and mass concrete walls
77. Drainage measures to preserve stability
78. Performance of drainage system
79. Surface channels
80. Safety required during excavation and construction
81. Weep holes
82. Copings
83. Bonding and foundation required
84. Bond courses required
85. Permission from Building Authority to sink or reopen wells
86. Performance
87. Wells prohibited in certain places
88. Wells to be covered and lined
89. Safety measures required
90. Fire resisting construction
91. Harbourage of vermin
92. (Omitted as spent)
93. Transitional