AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1994 - CHAPTER 311N AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1994 - LONG TITLE Empowering section VerDate:30/06/1997 (Cap 311 section 19(1)) [26 August 1994] (L.N. 478 of 1994) AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1994 - SECT 1 Notice of existing premises used for specified processes VerDate:30/06/1997 The owner of premises used for the conduct of any of the specified processes listed in Schedule 1 shall give to the Authority a written notice, containing the particulars and information specified in the form set out in Schedule 2, of the existence of the premises. (Enacted 1994) AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1994 - SECT 2 (Omitted as spent) VerDate:30/06/1997 (Omitted as spent) (Enacted 1994) AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1994 - SCHEDULE 1 SPECIFIED PROCESSES VerDate:30/06/1997 [section 1] 1. Organic Chemical Works 2. Zinc Galvanising Works 3. Rendering Works 4. Non-ferrous Metallurgical Works 5. Glass Works (Enacted 1994) AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1994 - SCHEDULE 2 FORM VerDate:30/06/1997 [section 1] AIR POLLUTION CONTROL ORDINANCE (Chapter 311) NOTIFICATION OF THE EXISTENCE OF PREMISES USED FOR THE CONDUCT OF A SPECIFIED PROCESS PURSUANT TO SECTION 19(1) To: The Authority 1. I/We* the undersigned, being the owner/owners* specified in paragraph 2 of the undermentioned premises, hereby give notice that the premises described in paragraph 3 are used for the conduct of the process specified in paragraph 4 and declare that the particulars and information furnished hereunder are correct. This notification consists of .............. pages, with associated drawing (............. sheets). Signature: ........................................................................... ...... Name: ........................................................................... ........... Date: ........................................................................... .............. 2. Details of Owner(s) Name(s) of Owner(s) (Surname first) English Chinese Status (e.g. lessee, occupier) Correspondence Address Telephone Number Identity Card/Certificate of Incorporation* Number 3. Premises where the Specified Process is Conducted Name of Premises English Chinese Address TelephoneNumber Contact Person in the Premises (Surname First) English Chinese Title or Position Correspondence Address TelephoneNumber Business Registration No. Certificate of Incorporation No. No. of Employees in the Premises Area of the Premises (m2) Land Status Names(s) of Land Owner(s) English Chinese Address TelephoneNumber 4. Nature of Work Specified Process referred in Schedule 1 to the Ordinance Brief Description of Process Raw materials with Percentage Composition Products with Percentage Composition Normal Normal Hourly Maximum Hourly Maximum Daily Daily Monthly Monthly Raw Materials Consumption Rates (tonnes) Annual Product Production Rates (tonnes) Annual Installed/Processing* Capacity Total Storage Capacity of the Tanks used to store Organic Liquids (For Cement Works only) Normal Operating Hours From To Operating Hours per Day Operating Schedule Operating Days per Year 5. Particulars of the Emission Points and Associated Equipment A. Emission Point where Air Pollutant is Emitted Emission Point No. Discharge Exit or Chimney Height (m above ground) Width (m) Length (m) Cross-section of Discharge Exit or Chimney Diameter(m) B. Associated Equipment from which the Air Pollutant is Generated Type of Equipment Equipment No. Date of Installation Width (m) Length (m) Height (m) Dimensions of Equipment Diameter(m) Mode of Operation (Continuous/Batch) Installed/Processing* Capacity Duration of each Batch (h) For Batch Process No. of Batches per Day Type of Organic Liquid Stored For Tanks Used to Store Organic Liquids, including Liquid Fuels Tank Storage Capacity (m3) Type of Fuel Using Equipment Type Ash Content (%) Sulphur Content (%) Fuel to be Used Other Specifications Maximum Fuel Using Equipment Fuel Consumption Rate (kg/h) Normal Type Pollutant to be Controlled Air Pollution Control Equipment Incorporated Designed Efficiency (%) Operating Hours per Day Operating Schedule Operating Days per Month 6. Drawings (1) Please provide- (a) schematic diagrams of process flow showing the flow of materials, including raw materials, materials in process of manufacture, manufactured materials, by-products and waste materials; and (b) a block plan showing the locations of all emission points in the premises with consistent reference numbers. (2) All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers. * Delete whichever is inapplicable. (Enacted 1994. L.N. 212 of 1996)