AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1993 - CHAPTER 311G AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1993 - LONG TITLE Empowering section VerDate:30/06/1997 (Cap 311 section 19(1)) (L.N. 478 of 1994) [6 August 1993] (L.N. 312 of 1993) AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1993 - SECT 1 Notice of existing premises used for specified processes VerDate:30/06/1997 Notice of the existence of premises used for the conduct of any of the specified processes listed in Schedule 1, containing the particulars and information specified in the form set out in Schedule 2, shall be given in writing by the owner of the premises to the Authority, in the manner specified in that form. (Enacted 1993) AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1993 - SECT 2 (Omitted as spent) VerDate:30/06/1997 (Omitted as spent) (Enacted 1993) AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1993 - SCHEDULE 1 SPECIFIED PROCESSES VerDate:30/06/1997 [section 1] 1. Aluminium Works 2. Cement Works 3. Ceramic Works 4. Copper Works 5. Gas Works 6. Petrochemical Works 7. Sulphuric Acid Works 8. Tar and Bitumen Works 9. Lead Works 10. Asbestos Works 11. Chemical Incineration Works 12. Hydrochloric Acid Works 13. Hydrogen Cyanide Works 14. Sulphide Works 15. Pathological Waste Incinerators 16. Petroleum Works (Enacted 1993) AIR POLLUTION CONTROL (SPECIFIED PROCESSES) (SPECIFICATION OF REQUIRED PARTICULARS AND INFORMATION) ORDER 1993 - SCHEDULE 2 FORM VerDate:30/06/1997 [section 1] AIR POLLUTION CONTROL ORDINANCE (Chapter 311) NOTIFICATION OF THE EXISTENCE OF PREMISES USED FOR THE CONDUCT OF A SPECIFIED PROCESS PURSUANT TO SECTION 19(1) To: The Authority 1. I/We* the undersigned, being the owner/owners* specified in paragraph 2 of the undermentioned premises, hereby give notice that the premises described in paragraph 3 are used for the conduct of the process specified in paragraph 4 and declare that the particulars and information furnished hereunder are correct. This notification consists of ............ pages, with associated drawing (........... sheets). Signature: ........................................ .......................................................................... ............ Name: .................................................................. ................................................................ Date: ............................................... ................................................................ ..................... 2. Details of Owner(s) Name(s) of Owner(s (Surname First) English Chinese Status (e.g. lessee, occupier) Correspondence Address Telephone Number Identity Card/Certificate of Incorporation* Number 3. Premises where the Specified Process is Conducted Name of Premises English Chinese Address TelephoneNumber Contact Person in the Premises (Surname First) English Chinese Title or Position Correspondence Address TelephoneNumber Business Registration No. Certificate of Incorporation No. No. of Employees in the Premises Area of the Premises (m2) Land Status Names(s) of Land Owner(s) English Chinese Address TelephoneNumber 4. Nature of Work Specified Process referred in Schedule 1 to the Ordinance Brief Description of Process Raw materials with Percentage Composition Products with Percentage Composition Normal Normal Hourly Maximum Hourly Maximum Daily Daily Monthly Monthly Raw Materials Consumption Rates (tonnes) Annual Product Production Rates (tonnes) Annual Installed/Processing* Capacity Total Silo Capacity (For Cement Works only) Normal Operating Hours From To Operating Hours per Day Operating Schedule Operating Days per Year 5. Fuel Using/processing Equipment Emission Point No. Discharge Exit or Chimney Height (m above ground) Width (m) Length (m) Cross-section of Discharge Exit or Chimney Diameter(m) Type of Equipment Equipment No. Date of Installation Width (m) Length (m) Height (m) Equipment Serving the Emission Point Dimensions of Equipment Diameter (m) Mode of Operation (Continuous/Batch) Installed/Processing* Capacity Duration of each Batch (h) For Batch Process No. of Batches per Day Type of Fuel Using Equipment Date of Installation Type Ash Content (%) Sulphur Content (%) Fuel to be Used Other Specifications Maximum For Fuel Using Equip-ment Fuel Consumption Rate (kg/h) Normal Type Pollutant to be controlled Air Pollution Control Equipment Designed Efficiency (%) Operating Hours per Day Operating Schedule Operating Days per Month 6. Drawings Please provide schematic diagrams of process flow showing the flow of materials, including raw materials in process of manufacture, manufactured materials, by-products and waste materials. All emission points and processes/equipment, including air pollution control equipment, associated with each emission point, must be identified and labelled with consistent reference numbers. * Delete whichever is inapplicable. (Enacted 1993. L.N. 212 of 1996)