Hong Kong Regulations
[Index]
[Table]
[Search]
[Notes]
[Noteup]
[Previous]
[Next]
[Download (Current & Past)]
[Download (Current only)]
[繁體中文]
[Help]
FACTORIES AND INDUSTRIAL UNDERTAKINGS (LOADSHIFTING MACHINERY) REGULATION - SECT 6
Production of certificate
This section has commenced operation since 1 September 2002 only in so far as
it relates to Part I and paragraphs (a) to (e) in Part II of the Schedule.-
see L.N. 81 of 2002.
(1) A person who operates a loadshifting machine shall, on being so required
by an occupational safety officer, produce his valid certificate to the
officer for inspection.
(2) A person who is unable to produce his valid certificate for inspection
when required to do so under subsection (1), shall produce it for inspection
by the officer within such reasonable time and at such reasonable place as
required by the officer.
[Index]
[Table]
[Search]
[Notes]
[Noteup]
[Previous]
[Next]
[Download (Current & Past)]
[Download (Current only)]
[繁體中文]
[Help]