HKLII Hong Kong Regulations

[Index] [Table] [Search] [Notes] [Noteup] [Previous] [Download (Current & Past)] [Download (Current only)] [繁體中文] [Help]

BOILERS AND PRESSURE VESSELS (FORMS) ORDER - SCHEDULE

SCHEDULE
[paragraphs 2, 3 & 4]

FORM 1

BOILERS AND PRESSURE VESSELS ORDINANCE

(Chapter 56)

CERTIFICATE OF FITNESS FOR A STEAM BOILER

Registration number of boiler ............................................................................................
Name of owner ...............................................................................................................
Address of owner ...........................................................................................................
.......................................................................................................................................
Address of installation ......................................................................................................
Class or type of boiler ......................................................................................................
Date of construction and brief history ...............................................................................
.......................................................................................................................................

Particulars of test:-

Boilers examined internally and externally
and found to be or placed in a satisfactory
condition.
Signature ...........................................

Date ..................................................

Boiler mountings examined and found
satisfactory.
Signature ...........................................

Date ..................................................

*Auxiliary equipment (including the fuel
burning installation) examined and found
satisfactory.
Signature ...........................................

Date ..................................................

*Boiler examined under hydraulic test to a
pressure of ................................................
..................................................................
Signature ...........................................

Date ..................................................

*Miscellaneous inspections:
..................................................................
..................................................................
Signature ...........................................

Date ..................................................

*In accordance with section 28, the steam
container connected to the boiler has been
examined and the outlet therefrom found
to be open and free from obstruction.
Signature ...........................................

Date ..................................................


I certify that (i) I have this day examined the above boiler under pressure and I am satisfied that it is in safe working order and may be used and operated at a maximum permissible working pressure of ............................................................................................... subject to (here insert any conditions imposed under section 33(5) of the Ordinance) .......................................................................................................................................
..................................................................................................................................... ;

(ii) that the safety valve has been set and sealed or otherwise adjusted in accordance with section 45 of the Ordinance.

This certificate will remain in force until ............................................................................


Date ....................................................
.........................................................
Boiler Inspector.


*Delete if not applicable.

Note: Unless an earlier examination is required in consequence of any condition endorsed on this certificate or by other requirements of the Ordinance, the period of validity of this certificate shall be in accordance with section 27(1) of the Boilers and Pressure Vessels Ordinance.

WARNING You are reminded that the boiler must be re-examined before the expiry of this certificate. It is an offence to use or operate a boiler unless it has been examined and a certificate of fitness issued after that examination. If convicted, the penalty is a fine of up to $30000 (s.49(1) and (8) of the Boilers and Pressure Vessels Ordinance).
________________

FORM 2
BOILERS AND PRESSURE VESSELS ORDINANCE
(Chapter 56)
CERTIFICATE OF FITNESS FOR A PRESSURE VESSEL
(OTHER THAN A PRESSURIZED FUEL CONTAINER)

Registration number of pressure vessel .............................................................................

Name of owner ...............................................................................................................

Address of owner ............................................................................................................

Address of installation ......................................................................................................

Description of pressure vessel ..........................................................................................

Date of construction ........................................................................................................

Particulars of test:-

Pressure vessel examined internally and
externally and found to be or placed in
a satisfactory condition.
Signature ...........................................

Date ..................................................

*Pressure vessel examined under hydraulic
test to a pressure of ..................................
................................................................
Signature ...........................................

Date ..................................................

Fittings examined and found satisfactory.
Signature ...........................................

Date ..................................................


I certify that (i) I have this day examined the above pressure vessel under pressure and I am satisfied that it is in safe working order and may be used at a maximum permissible working pressure of ......................................................................................................... subject to (here insert any conditions required under section 33(5) of the Ordinance) .......................
.......................................................................................................................................
.................................................................................................................................... ;

(ii) that the safety valve has been set and sealed or otherwise adjusted in accordance with section 45 of the Ordinance.

This certificate will remain in force until ............................................................................


Date ....................................................
.........................................................
*Boiler Inspector.
*Air Receiver Inspector.

*Delete if not applicable.

Note: Unless an earlier examination is required in consequence of any condition endorsed on this certificate or by other requirements of the Ordinance, the period of validity of this certificate shall be in accordance with section 27(1)(b) of the Boilers and Pressure Vessels Ordinance.

WARNING You are reminded that the pressure vessel must be re-examined before the expiry of this certificate. It is an offence to use or operate a pressure vessel (other than a pressurized fuel container) unless it has been examined and a certificate of fitness issued after that examination. If convicted the penalty is a fine of up to $30000 (s. 49(1) and (8) of the Boilers and Pressure Vessels Ordinance).
_______________

FORM 3

BOILERS AND PRESSURE VESSELS ORDINANCE

(Chapter 56)

APPLICATION FOR REGISTRATION

TO THE AUTHORITY

Sir,

Part I I, the undersigned ...............................................................................................
(NAME IN BLOCK LETTERS) of .........................................................................
(NAME of establishment) residing at ........................................................................ Identification No. ..................................................................................
Date and place of manufacture .............................................................
............................................................................................................ .......................................................................................................................

*STEAM CONTAINER Type ...............................................................................
Identification No. .............................................................
Date and place of manufacture ........................................

This steam container *is/is not connected to the boiler described above.
This steam container was constructed by ..........................................................
.......................................................................................................................

*PRESSURE VESSEL,
Type
steam receiver*
air receiver*
Identification No. .............................................................
Date and place of manufacture ........................................
.......................................................................................

This pressure vessel *is/is not designed to be transportable from one place to another.
This pressure vessel was constructed by ..........................................................
.......................................................................................................................

*PRESSURIZED FUEL CONTAINER Description ..........................................
Identification No. ..................................
............................................................
Date and place of manufacture .............
............................................................
This pressurized fuel container was constructed by ...........................................
.......................................................................................................................

Part II
The name and address of the
premises at which the
boiler*
steam container*
pressure vessel*
pressurized container*
*is/are installed is ....................................................................................................
Part III
I declare that *I am the owner/the owner's name and address is .....................
................................................................................................... of ...................
...........................................................................................................................

Date ....................................
.........................................................
(Signature of applicant).

.........................................................
(Capacity in which applicant signs).

*Delete if not applicable.

Note 1 Application may be made on this form for any one or one of each of the categories of appliances required to be registered. Where more than one of any of the categories are required to be registered a separate application should be made for each unit.

Note 2 "Owner", in relation to a boiler or pressure vessel, includes any person who is in possession of the boiler or pressure vessel under an agreement of hire purchase or under a contract between a supplier of boilers or pressure vessels, or the agent of any such supplier, and such person for the sale of the boiler or pressure vessel, notwithstanding that the property in the boiler or pressure vessel has not passed to such person, and, where the owner of a boiler or pressure vessel cannot be found or ascertained or is absent from Hong Kong or is under a disability also includes the agent of the owner.
_______________

FORM 4
[section 6]
(Front of Cover)
BOILERS AND PRESSURE VESSELS ORDINANCE

(Chapter 56)

CERTIFICATE OF COMPETENCY
(Inside Front Cover)

BOILERS AND PRESSURE VESSELS ORDINANCE

(Chapter 56)

CERTIFICATE OF COMPETENCY
Page 1
Issued under the provisions of the

BOILERS AND PRESSURE VESSELS ORDINANCE

(Chapter 56)
Certificate No. ................................................................................................................
Issued to ........................................................................................................................
Photograph


Identity Card No. ............................................................................................................

Page 2
CERTIFICATE

This is to certify that ...................................................................................................
................................................................................................................................ who has been found duly qualified in accordance with Section 6 of the Boilers and Pressure Vessels Ordinance is competent to operate boilers and steam receivers covered by the class/es of equipment specified hereunder:-
.......................................................................................................................................
.......................................................................................................................................


..........................................
Authority.
Hong Kong ................................................. 19 .......
Page 3

ENDORSEMENT OF CERTIFICATE

In addition to the equipment specified on Page 2 the holder of this Certificate has been found duly qualified in accordance with Section 6 of the Boilers and Pressure Vessels Ordinance to operate boilers and steam receivers covered by the following class/es of equipment:-
.......................................................................................................................................
.......................................................................................................................................

.........................................
Authority.
Hong Kong ................................................. 19 .......

CLASSES AND TYPES OF EQUIPMENT

Class of
Equipment
Type of Boiler/Steam Receiver for which
Certificate Valid
All Classes
(I to VI)
All Boilers (including automatically controlled with superheaters) and Steam Receivers
Class I All Water-tube Boilers (including automatically controlled with superheaters) and Steam Receivers
Class I(A) Water-tube Boilers (including automatically controlled but without superheaters) and Steam Receivers
Class I(B) Manually Controlled Water-tube Boilers (without superheaters) and Steam Receivers
Class II All Fire-tube Boilers (including automatically controlled) and Steam Receivers
Class II(A) Automatic Fire-tube boilers and Steam Receivers
Class II(B) Manually Controlled Fire-tube Boilers and Steam Receivers
Class III All Electrically Heated Boilers (including automatically controlled) and Steam Receivers
Class III(A) Manually Controlled Electrically Heated Boilers
Class IV Sterilizing and Vulcanizing Boilers
Class V Special Purpose Boilers as Specified
Class VI Steam Receivers
(87 of 1988 s. 56; L.N. 73 of 1996)


[Index] [Table] [Search] [Notes] [Noteup] [Previous] [Download (Current & Past)] [Download (Current only)] [繁體中文] [Help]