HKLII Hong Kong Regulations

[Index] [Table] [Search] [Notes] [Noteup] [Previous] [Next] [Download (Current & Past)] [Download (Current only)] [繁體中文] [Help]

MERCHANT SHIPPING (LOCAL VESSELS) (FEES) REGULATION - SECT 5

Fees for application for grant of permission for laid-up vessel

The fee to be paid in respect of an application under section 21 of the
Certification and Licensing Regulation for the grant of permission for a 
laid-up vessel in respect of a local vessel of a type described in column 2 of
Part 2 of Schedule 1 is—

   (a)  in the case of a permission for the vessel to be berthed, moored or
        anchored at any place in the waters of Hong Kong for a period of 12
        months, the fee specified in column 3 of that Part opposite the type
        of vessel;

   (b)  in the case of a permission for the vessel to be berthed, moored or
        anchored at any place in the waters of Hong Kong for a period of less
        than 12 months, a fee equal to the aggregate of the following
        amounts—

        (i)    for each of the following within the permission period— (A)
               the monthly period beginning on the first day of the permission
               period; (B) each subsequent monthly period,
an amount equal to 1/12 of the fee specified in column 3 of that Part opposite
the type of vessel;

        (ii)   for each day within the permission period that does not fall
               within a monthly period referred to in subparagraph (i), an
               amount equal to 1/365 of the fee specified in column 3 of that
               Part opposite the type of vessel;

   (c)  in the case of a permission for the vessel to be berthed, moored or
        anchored at any place in the waters of Hong Kong for a period of more
        than 12 months, a fee equal to the aggregate of the following
        amounts—

        (i)    for each of the following within the permission period— (A)
               the yearly period beginning on the first day of the permission
               period; (B) each subsequent yearly period,
the fee specified in column 3 of that Part opposite the type of vessel;

        (ii)   for each of the following within the permission period— (A)
               the monthly period beginning on the day immediately following
               the last day of the yearly period or the last yearly period, as
               the case may be, referred to in subparagraph (i); (B) each
               subsequent monthly period,
an amount equal to 1/12 of the fee specified in column 3 of that Part opposite
the type of vessel;

        (iii)  for each day within the permission period that does not fall
               within subparagraph (i) or (ii), an amount equal to 1/365 of
               the fee specified in column 3 of that Part opposite the type of
               vessel.



[Index] [Table] [Search] [Notes] [Noteup] [Previous] [Next] [Download (Current & Past)] [Download (Current only)] [繁體中文] [Help]