Hong Kong Regulations
[Index]
[Table]
[Search]
[Notes]
[Noteup]
[Previous]
[Next]
[Download (Current & Past)]
[Download (Current only)]
[繁體中文]
[Help]
GAS SAFETY (GASHOLDERS EXAMINATION) REGULATION - SCHEDULE 1
FORM
[sections 2 & 9]
QUARTERLY GASHOLDER INSPECTION AND MAINTENANCE RECORD
DRY-SEALED GASHOLDER
Name of owner: Address: Gasholder number: Type of gasholder
(e.g. Wiggins, MAN, etc.): Capacity: Type of gas stored: Operating pressure:
Built in (date): by: Last inspection date: Stock in holder at time of
inspection: Maximum
Minimum Inspected by: Date of inspection: 1. Condition of site
(a) Security
(b) Freedom from hazard or obstruction 2. Gasholder condition
(a) Seal condition
(i) Atmosphere above seal:
(ii) Seal surface -signs of folds, creases, surface cracks or drag
down:
(b) Levels
Variations in level of piston/fender unit taken at each wire rope near top,
midway and bottom:
(c) Clearances
(i) Variations in clearance between shell and piston/fender taken
at each wire rope near top, midway and bottom:
(ii) Variations in clearance between shell and telescoping fender
taken at each wire rope near top, midway and bottom:
(d) Condition of balance weight and rope:
(e) Lubrication of all locks and hinges:
(f) Check on bottom drain valves:
(g) Removal of condensate: 3. Any other apparent abnormality (Enacted
1996)
[Index]
[Table]
[Search]
[Notes]
[Noteup]
[Previous]
[Next]
[Download (Current & Past)]
[Download (Current only)]
[繁體中文]
[Help]