NOISE CONTROL (CONSTRUCTION WORK) REGULATION - CHAPTER 400G NOISE CONTROL (CONSTRUCTION WORK) REGULATION - LONG TITLE Empowering section VerDate:30/06/1997 (Cap 400 section 27(1A)) (1 May 1996) (L.N. 29 of 1996) NOISE CONTROL (CONSTRUCTION WORK) REGULATION - SECT 1 (Omitted as spent) VerDate:30/06/1997 (Omitted as spent) (Enacted 1996) NOISE CONTROL (CONSTRUCTION WORK) REGULATION - SECT 2 Interpretation VerDate:30/06/1997 In this Regulation- "formwork" (模板) means any type of metallic, wooden or fibreglass construction including any structural support designed to enable concrete, cement or other material poured in a fluid state to assume a particular shape upon setting; "hammering" (敲擊) means to strike repeatedly any object, instrument or surface with any other object, instrument or surface; "rubble" (瓦礫) means any kind of debris or superfluous material arising from construction work including bricks, concrete, metal, glass, wood, plastic, earth, rock, bamboo or fibreglass; "scaffolding" (棚架) means any type of construction made of metal, wood or bamboo whose purpose is to enable temporary access to a part or parts of another structure or building whether completed or not. (Enacted 1996) "formwork" (模板) "hammering" (敲擊) "rubble" (瓦礫) "scaffolding" (棚架) NOISE CONTROL (CONSTRUCTION WORK) REGULATION - SECT 3 Construction work VerDate:30/06/1997 The construction work in the Schedule is prescribed for the purpose of section 6(2) of the Ordinance. (Enacted 1996) NOISE CONTROL (CONSTRUCTION WORK) REGULATION - SCHEDULE SCHEDULE VerDate:30/06/1997 [section 3] 1. Erection or dismantling of formwork or scaffolding. 2. Loading, unloading or handling of rubble, wooden boards, steel bars, wood or scaffolding material. 3. Hammering. (Enacted 1996)