Hong Kong RegulationsFEES
| Item | Description |
Fee |
1. |
Issue or deemed issue of an excavation permit referred to in sections 10A(1) and 10D(2) of the Ordinance................................................................. |
$1860 plus a daily fee of $32 per day for the whole duration of the excavation permit
|
2. |
Extension in respect of an excavation permit referred to in sections 10A(3) and 10D(4) of the Ordinance.................................................................. |
(a) $590 plus a daily fee of $32 per day for the whole duration of the extended period; and (b) economic costs in the following scale for the whole duration of the extended period—
(ii) $7000 per day for a sensitive street; (iii) $1500 per day for a remaining street. |
Item |
Description |
Fee |
1. |
Issue of an excavation permit referred to in section 10A(1) of the Ordinance......................................................................... |
|
2. |
Extension in respect of an excavation permit referred to in section 10A(3) of the Ordinance.............................................. |
|
Item |
Description |
Fee |
1. |
Emergency excavation made or maintained during the initial period referred to in section 10C(4) of the Ordinance................ | $1860 plus a daily fee of $32 per day for the whole duration of the emergency excavation determined in accordance with section 10C(5) |