Hong Kong Regulations
[Index]
[Table]
[Search]
[Notes]
[Noteup]
[Previous]
[Next]
[Download (Current & Past)]
[Download (Current only)]
[繁體中文]
[Help]
PEAK TRAMWAY (SAFETY) REGULATIONS - REGULATION 13
Duty relating to rescue and rescue equipment
The engineering superintendent shall-
(a) carry out practice rescue operations on the tramway at such intervals
as may reasonably be required by the Director;
(b) test all rescue equipment-
(i) to twice the normal rescue load immediately prior to any
practice rescue operation;
(ii) once a year to the manufacturer's recommended proof loading;
(c) immediately after any practice rescue operation, examine all rescue
equipment and ensure that all damaged equipment is repaired forthwith
and then tested to the manufacturer's recommended proof loading; and
(d) immediately after any rescue equipment has been used in the rescue of
passengers, examine all rescue equipment and repair or replace such
equipment, if necessary, before the tramway resumes operation.
(Enacted 1989)
[Index]
[Table]
[Search]
[Notes]
[Noteup]
[Previous]
[Next]
[Download (Current & Past)]
[Download (Current only)]
[繁體中文]
[Help]