HKLII Hong Kong Regulations

[Index] [Search] [Notes] [Noteup] [Next] [Download (Current & Past)] [Download (Current only)] [繁體中文] [Help]

BUILDING (REFUSE STORAGE AND MATERIAL RECOVERY CHAMBERS AND REFUSE CHUTES) REGULATIONS

- CHAPTER 123H

TABLE OF PROVISIONS

           Long Title

   1.      (Repealed 39 of 2000 s. 7)
   2.      Interpretation
   3.      Refuse storage and material recovery chambers or material recovery
           chambers to be provided for in plans relating to buildings specified
           in the Schedule
   4.      Refuse storage and material recovery chambers to comply with
           regulations 5 to 12A
   4A.     Material recovery chambers to comply with regulations 5 to 12A
   4B.     Refuse storage and material recovery rooms to comply with regulations
           8(1), 12A, 12B and 12C
   5.      Access to refuse storage and material recovery chambers for emptying
           refuse containers and recovered materials
   6.      Refuse storage and material recovery chambers to be fully enclosed
           save for door etc.
   7.      Refuse storage and material recovery chambers to have one external
           wall
   8.      Minimum dimensions of refuse storage and material recovery chambers
   9.      Construction of refuse storage and material recovery chambers
   10.     Access door to refuse storage and material recovery chambers and
           construction thereof
   11.     Drainage of refuse storage and material recovery chambers
   12.     Refuse storage and material recovery chambers to have water supply
           point
   12A.    Mechanical ventilation and air purifying facilities for refuse storage
           and material recovery chambers
   12B.    Refuse storage and material recovery rooms to be readily accessible
   12C.    Refuse storage and material recovery rooms to be provided with
           adequate lighting
   13.     Refuse chutes to comply with regulations 14 to 25
   14.     Bends of offset in any refuse chute prohibited
   15.     Minimum height of top of refuse chutes
   16.     Lining and internal size of refuse chutes
   17.     Walls of refuse chutes
   18.     Refuse chute to be provided with shutter
   19.     Ventilating pipe for refuse chute
   20.     Inspection and cleansing of refuse chute
   21.     Construction of internal surface of refuse chute
   22.     Situation of hopper
   23.     Construction of hopper
   24.     Hopper recess
   25.     Junction of hopper with refuse chute
           SCHEDULE

[ Note: This table has been automatically generated and may be incomplete. ]



[Index] [Search] [Notes] [Noteup] [Next] [Download (Current & Past)] [Download (Current only)] [繁體中文] [Help]