Hong Kong Regulations
- CHAPTER 123H
TABLE OF PROVISIONS
Long Title
1. (Repealed 39 of 2000 s. 7)
2. Interpretation
3. Refuse storage and material recovery chambers or material recovery
chambers to be provided for in plans relating to buildings specified
in the Schedule
4. Refuse storage and material recovery chambers to comply with
regulations 5 to 12A
4A. Material recovery chambers to comply with regulations 5 to 12A
4B. Refuse storage and material recovery rooms to comply with regulations
8(1), 12A, 12B and 12C
5. Access to refuse storage and material recovery chambers for emptying
refuse containers and recovered materials
6. Refuse storage and material recovery chambers to be fully enclosed
save for door etc.
7. Refuse storage and material recovery chambers to have one external
wall
8. Minimum dimensions of refuse storage and material recovery chambers
9. Construction of refuse storage and material recovery chambers
10. Access door to refuse storage and material recovery chambers and
construction thereof
11. Drainage of refuse storage and material recovery chambers
12. Refuse storage and material recovery chambers to have water supply
point
12A. Mechanical ventilation and air purifying facilities for refuse storage
and material recovery chambers
12B. Refuse storage and material recovery rooms to be readily accessible
12C. Refuse storage and material recovery rooms to be provided with
adequate lighting
13. Refuse chutes to comply with regulations 14 to 25
14. Bends of offset in any refuse chute prohibited
15. Minimum height of top of refuse chutes
16. Lining and internal size of refuse chutes
17. Walls of refuse chutes
18. Refuse chute to be provided with shutter
19. Ventilating pipe for refuse chute
20. Inspection and cleansing of refuse chute
21. Construction of internal surface of refuse chute
22. Situation of hopper
23. Construction of hopper
24. Hopper recess
25. Junction of hopper with refuse chute
SCHEDULE
[ Note: This table has been automatically generated and may be incomplete. ]