BOILERS AND PRESSURE VESSELS ORDINANCE - SECT 38
Procedure on, and method of, examination of boilers
(1) The following provisions apply to the examination of a boiler for the
purposes of section 27 or 32- (Amended 67 of 1978 s. 16)
(a) the boiler shall first be thoroughly examined when it is cold and has
been prepared for examination in the manner prescribed in section 37
(1);
(b) where, upon the examination in accordance with paragraph (a), the
appointed examiner who carried out the same is of opinion that the
boiler is in need of immediate repairs in order to maintain it in safe
working order, he shall in writing notify the owner of the boiler of
the repairs that he considers necessary;
(c) in each of the following cases, the boiler shall next be subjected by
an appointed examiner to an hydraulic test-
(i) where any repairs that have been carried out pursuant to a
notice given by an appointed examiner in accordance with
paragraph (b) are extensive repairs;
(ii) where the size or design of the boiler is such that it is not
possible for an appointed examiner to enter it in order to
examine the internal parts thereof; and
(iii) without prejudice to the provisions of subparagraph (i) or
(ii) , whenever an appointed examiner considers it necessary;
(ca) where the boiler is uncertified and the Authority, by notice in
writing to the owner, so requires, the boiler shall be subjected to an
hydraulic test or to testing by a specified non-destructive technique;
and (Added 87 of 1988 s. 16)
(d) finally, on the first occasion on which the boiler is again operated,
the boiler, save for any economizer or superheater that may be fitted
therein, shall be- (Amended 87 of 1988 s. 16)
(i) examined when it is under the pressure that will be specified
in the certificate of fitness as the maximum permissible
working pressure at which it may be operated; and
(ii) subjected by the appointed examiner to a pressure accumulation
test if he considers it necessary. (Replaced 67 of 1978 s. 16)
(2) The following provisions apply to the examination of a boiler for the
purposes of section 24-
(a) where an appointed examiner considers it necessary, the boiler shall
first be examined when it is cold and has been prepared for
examination in the manner prescribed in section 37(1)(a), (c), (d) and
(e);
(b) where an appointed examiner considers it necessary, the boiler shall
next be subjected by an appointed examiner to an hydraulic test;
(ba) where the boiler is uncertified and the Authority, by notice in
writing to the owner, so requires, the boiler shall be subjected to an
hydraulic test or to testing by a specified non-destructive technique;
and (Added 87 of 1988 s . 16)
(c) finally, on the first occasion on which the boiler is operated the
boiler, save for any economizer or superheater that may be fitted
therein, shall be- (Amended 87 of 1988 s. 16)
(i) examined when it is under the pressure that will be specified
in the certificate of fitness as the maximum permissible
working pressure at which it may be operated; and
(ii) subjected to a pressure accumulation test by the appointed
examiner except where he considers that the superheater might
be damaged thereby. (Replaced 67 of 1978 s. 16)
(3) The following provisions apply to the examination of a boiler for the
purposes of section 25-
(a) the boiler shall first be examined when it is cold and has been
prepared for examination in the manner prescribed in section 37(1)(a),
(c) , (d) and (e);
(b) where an appointed examiner considers it necessary, the boiler shall
next be subjected by an appointed examiner to an hydraulic test; and
(c) finally, on the first occasion on which the boiler is again operated,
the boiler, save for any economizer or superheater that may be fitted
therein, shall be- (Amended 87 of 1988 s. 16)
(i) examined when it is under the pressure that will be specified
in the certificate of fitness as the maximum permissible
working pressure at which it may be operated; and
(ii) subjected by the appointed examiner to a pressure accumulation
test if he considers it necessary. (Replaced 67 of 1978 s. 16)
(4) The following provisions apply to the examination of a boiler for the
purposes of section 26-
(a) the boiler shall first be subjected by an appointed examiner to an
hydraulic test; and
(b) on the first occasion on which the boiler is again operated, the
boiler, save for any economizer or superheater that may be fitted
therein, shall be- (Amended 87 of 1988 s . 16)
(i) examined when it is under the pressure that will be specified
in the certificate of fitness as the maximum permissible
working pressure at which it may be operated; and
(ii) subjected by the appointed examiner to a pressure accumulation
test if he considers it necessary. (Replaced 67 of 1978 s. 16)