Remarks:
Due to technical constraints, Schedule 1A and Schedule 1B of this Ordinance are placed after Schedule 1 in the BLIS system. The correct sequence of the Schedules should be "Schedule 1A, Schedule 1B, Schedule 1".
[section 2]
1. Tradelink Electronic Commerce Limited
2. Global e-Trading Services Limited (Added L.N. 222 of 2003) (Schedule 1A added 19 of 2001 s. 13)
[
Index]
[
Table]
[
Search]
[
Notes]
[
Noteup]
[
Previous]
[
Next]
[
Download (Current & Past)]
[
Download (Current only)]
[
繁體中文]
[
Help]